Zone de Texte: 2010 (10 + 14 + 1)
Abstracts 2010 (10)
Zimmermann K, Krieg T, Soltow M, Pavlovic D, Zhou J, Whynot S, Hung O, Murphy M, Lehmann C: 
Adenosine signalling has a protective role in intestinal ischemia and reperfusion injury. 
Critical Care 2010, 14(Suppl 1):P94.

Zimmermann K, Pavlovic D, Zhou J, Johnston B, and Lehmann C:
TLR4 inhibition improves intestinal microcirculation in experimental endotoxemia. 
Inflamm Res 2010, 59(Suppl1):S66.

Zimmermann K, Krieg T, Soltow M, Pavlovic D, Zhou J, Lehmann C:
The adenosine receptor agonist NECA improves microcirculation following intestinal ischemia and reperfusion. 
Inflamm Res 2010, 59(Suppl1):S11.

Rimasch D, Pavlovic D, Boesche M, Lehmann Ch, Wendt M, Usichenko TI. 
Erholung der psychomotorischen Leistung nach Allgemeinanästhesie bei ambulanten Patienten – die Suche nach einem geeigneten Testverfahren.
Anästhesiologie & Intensivmedizin 2010;51(Suppl.6):746.

Weber S, Balzer C, Pavlovic D, Wegner A, Wendt M, and Lehmann Ch
Dehydroepiandosterone and Sodium Orthovanadate effects on the intestinal microcirculation in experimental endotoxemia in rat
DAK, Nirnberg, 2010

Weber S, Balzer C, Pavlovic D, Wegner A, Wendt M, and Lehmann Ch
Dehydroepiandosterone (DHEA) and Sodium Orthovanadate (SOV) improve intestinal microcirculation in experimental endotoxemia
HAI, Berlin, 2010

Pavlovic D, Weber S, Balzer C, Wegner A, Wendt M, Lehmann C
Combination of dehydroepiandrosterone and orthovanadate reduces leukocyte activation and improves capillary perfusion within the intestinal microcirculation in experimental endotoxemia
Paris, World Congress for Microcirculation, Proceedings, PS2-77, p. 129, 2010.

Dragan Pavlovic, Claudius Balzer, Stefan Weber, Michael Wendt, Christian Lehmann
Dehydroepiandrosteron and sodium orthovanadate improve intestinal microcirculation in experimental endotoxemia
ESICM, Barcelona, 2010

Articles (14)
A. Spassov, T. Gredes, T.Gedrange, D. Pavlovic, D. Klein, S. Lucke, U. 
Botzenhart, C. Kunert-Keil
Expression von muskelspezifischen Wachstumsfaktoren in der orofazialen Muskulatur der mdx Maus
Jahrestagung der Deutschen Gesellschaft fuer Kieferorthopaedie (DGKFO) Frankfurt am Main, 11.11.-13.11.2010

Alexander Spassov, Tomasz Gredes, Tomasz Gedrange, Dragan Pavlovic und Christiane Kunert-Keil1 
Expression of myogenic regulatory factors in orofacial muscles of dystrophic (mdx) mice by Real-Time PCR 
European orthodontic society Congress Portoroz 15-19. May 2010 Eur J Orthod (2010) 32(6): e1-e156 

Simon-Friedrich Böttger, Dragan Pavlovic, Matthias Gründling, Michael Wendt, Orlando Hung, Dietrich Henzler, Hartmut Richard Kern, Christian Lehmann
Comparison of arterial pressure cardiac output monitoring with transpulmonary thermodilution in septic patients
Med Sci Monitor, 16: 1-7, 2010.					1.514

Spassov A, Gredes T, Gedrange T, Lucke S, Pavlovic D, Kunert-Keil C.
Histological changes in masticatory muscles of mdx mice.
Arch Oral Biol. 55: 318-324, 2010

M. Milchert, A. Spassov, K. Meissner, V. Nedelkov, C. Lehmann, M. Wendt, B.W. Loster, M. Mazurkievicz-Jank, T. Gedrange, D. Pavlovic
Skeletal musle relaxants inhibit rat tracheal smooth muscle tone in vitro
J Physiol Pharmacol, 60: (Supp. l8) 5-11, 2009 (printed in 2010)			2.631

R. Scheibe, M. Schade, M. Grundling, D. Pavlovic, M. Wendt, S. Retter, M. Murphy, U. Suchner, A. Spassov, T. Gedrange, Ch. Lehmann
Glutamine and alanyl-glutamine dipeptide reduce mesenteric plasma extravasation, leukocyte adhesion and TNF-α release during experimental endotoxemia
J Physiol Pharmacol, 60: (Supp. l8) 19-34, 2009 (printed in 2010)			2.631

Spassov A, Gredes T, Gedrange T, Lucke S, Morgenstern S, Pavlovic D, Kunert-Keil C.
Differential expression of MyHC isoforms in masticatory muscles of mdx mice
European Journal of Orthodontics 2010, Doi: cjq11310.1093/ejo/cjq113
IF: 0.975	

Pavlovic, D., Wendt, M., and Meissner, K.
Original and its replica
British J Anaesth, E-Letter, p: 1-3, with one Figure; 26 April, 2010.		2.920

Pavlovic, D.
Original and a ‘bench study’ replica
Anaesthesia, 65: (letter to the editor) 413–414, 2010					2.178

Joern Richter, Juan Zhou, Dragan Pavlovic, Ricardo Scheibe, Vo Hoai Bac, Johanna Blumenthal, Orlando Hung, Michael F. Murphy, Sara Whynot and Christian Lehmann
Vancomycin and to lesser extent tobramycin have vasomodulatory effects in experimental endotoxemia in the rat
Clin Hemorheol Microcirc. 2010;46(1):37-49.

Richter J*, Pavlovic D, Bac VH, Gründling M, Lehmann C 
The effects of vancomycin and tobramycin on the intestinal microcirculation in experimental endotoxaemia
Clin Hemorheol Microcirc. 2010;46(1):37-49.

Christian Fuchs, Elena Ladwig, Juan Zhou, Dragan Pavlovic, Kristina Behrend, Sara Whynot, Orlando Hung, Michael Murphy, Vladimir Cerny, Christian Lehmann
Argatroban administration reduces leukocyte adhesion and improves capillary perfusion within the intestinal microcirculation in experimental sepsis
Thromb Haemost. 2010 Nov;104(5):1022-8. Epub 2010 Aug 30.

Bert Wetzel, Dragan Pavlovic, Renate Kuse, Andreas Gibb, Harry Merk, Christian Lehmann, Michael Wendt, and Taras I. Usichenko
The Effects of Auricular Acupuncture on Fentanyl Requirement During Hip Arthroplasty – A Randomized Controlled Trial
Clin J Pain, in press 2010

T I Usichenko, A Mustea, D Pavlovic
On ears and Head
Acupunct Med December 2010 Vol 28 No 4

Pathak, D, S. Lopicic, M. Bratic-Stanojevic, D. Pavlovic, P. R. Andjus and V. Nedeljkov
Modulation of nickel-induced bursting with 4-aminopiridine in leech Retzius cells
Arch. Biol. Sci., 62 (4), 1035-1045, 2010.			 IF: 0.238

Dragan Pavlovic
Beatmungsgeret, insbesondere zur notffalmeßigen transtrachealen, intermitterenden Druckbeatmung
Offenlegungsschrift, Deutsche Patent Office 10 2009 029 959.A1 2010.12.30		0.8

Landsberger M, Zhou J, Wilk S, Thaumüller C, Pavlovic D, Otto M, Whynot S, Hung O, Murphy MF, Cerny V, Felix SB, Lehmann C.
Inhibition of lectin-like oxidized low-density lipoprotein receptor-1 reduces leukocyte adhesion within the intestinal microcirculation in experimental endotoxemia in rats.
Crit Care. 2010;14(6):R223. Epub 2010 Dec 10.


Books/Proceedings (1)
Pavlovic, D., Gründling, M, and Fischer, T.
Ethics for an aging world
International Conference, Heringsdorf, 23-26 Sept. 2010.
Journal für Anaesthesie und Intensivbehabdlung, 3 (Supplement), 2010.


2011 (9 + 15 + 1)
Abstracts (9)
Kuschnereit R, Lehmann C, Whynot S, Hung O, Shukla R, Henzler D, Cerny V, Pavlovic D, Kelly M: 
Cannabinoid receptor-1 inhibition causes anesthetic-induced excitation in septic rat. 
Critical Care 2011, 15(Suppl 1):P360.

Wagner L, Drzymulski I, Pavlovic D, Henzlers D, Wendt M, Lehmann C: 
Desmopressin improves intestinal functional capillary density and decreases leucocyte activation in experimental endotoxemia in the rat. 
Critical Care 2011, 15(Suppl 1):P256.

Kuster I, Lehmann C, Kuschnereit R, Whynot S, Hung O, Shukla R, Henzler D, Cerny V, Pavlovic D, Kelly M: 
Cannabinoid receptor-1 inhibition causes anesthetic-induced seizures in experimental sepsis. 
DAC-Abstract-CD, 2011.

Wagner L, Drzymulski I, Pavlovic D, Lehmann C, Henzler D, Wendt M: 
Desmopressin improves intestinal functional capillary density and decreases leucocyte activation in experimental endotoxemia in the rat. 
DAC-Abstract-CD, 2011.

Pavlovic D, Jaskulsky M, Weber S, Balzer C, Wegner A, Wendt M, Gru¨ndling, M, Lehmann CH
Combined therapy with dehydroepiandrosterone-orthovanadate may influence intestinal leukocyte activation and increase capillary perfusion in experimental endotoxemia in rats.
Infection, 39 (Sup. 2): S106, 2011. 

Kuhnert T, Herrmann A, Wegner A, Gru¨ndling M, Wendt M (1), Pavlovic D, Lehmann CH
The short time impact of different HES-solutions on the microcirculation of the mesentery is not different from crystalloids in colon ascendens stent peritonitis-induced experimental sepsis
Infection, 39 (Sup. 2): S104, 2011. 

Dragan Pavlovic
Beyond Paternalism
Conference Proceedings, Ethics for an aging world-2, Columbus, Ohio, 8-9 Oct, 2011.

T. Kuhnert, A. Herrmann, A. Wegner, M. Gründling, M. Wendt, D. Pavlovic, Ch. Lehmann 
The impact of different hydroxyethylstarch preparation on the microcirculation of the mesenteriy is not different from crystalloids in colon ascendens stent peritonitis- induced sepsis 
Journal of vascular sience, Vol 48, Suppl. 1, Page 99, September 2011.

Christian Lehmann1, Lea Schuster2, Friederike Soltow2, Juan Zhou1, Sara Whynot1, Orlando Hung1, Fatma Ashour1, Annette Wegner2, Dragan Pavlovic2 and George Robertson1
Inhibition of the cIAP2 pathway reduces leukocyte recruitment in the intestinal microcirculation in experimental sepsis 


Articles (15)
Wetzel B, Pavlovic D, Kuse R, Gibb A, Merk H, Lehmann C, Wendt M, Usichenko TI.
The effect of auricular acupuncture on fentanyl requirement during hip arthroplasty: a randomized controlled trial.
Clin J Pain. 2011 Mar-Apr;27(3):262-7.  IF: 3.114
 
Dragan Pavlovic, Alexander Spassov, and Christian Lehmann
Euthanasia: In defense of a good, ancient word
J Clin Res Bioeth. 2011, 2:105. INDEX COPERNICUS: 4.1
 
Spassov A, Pavlovic D, Spasov, K.
About light and shadow.
Am J Orthod Dentofacial Orthop Letters to Editor.2011 Jan;139(1):2. (IF: 1.354)
 
Spassov A, Gredes T, Gedrange T, Lucke S, Pavlovic D, Kunert-Keil C.
The expression of myogenic regulatory factors and muscle growth factors in the masticatory muscles of dystrophin-deficient (MDX) mice.
Cell Mol Biol Lett. 2011, 16(2):214-25.  IF: 1.127
 
Srdjan Lopicic, Marija Stanojevic, Pathak Dhruba, Dragan Pavlovic, Milica Prostran and Vladimir Nedeljkov
Excitatory amino acid beta-N-methylamino-L-alanine is a putative environmental neurotoxin
Journal Serbian Chemical Siciety, 2011, IF: 0.820
 
Usichenko TI, Lietz P, Pavlovic D, Schmidt R, Wendt M, Mustea A.
Acupuncture does not influence brainstem auditory evoked potentials: a volunteer crossover study.
Acupunct Med. 2011 Sep;29(3):215-20. IF: 1.381
 
Taras I. Usichenko, Eric Anders, Dragan Pavlovic
Certain doubts and uncertain fears of acupuncture
Pain 2011 Sep;152(9):2182-3 (IF : 5.486)
 
Pavlovic D, Spassov A
Asymmetries of Patient Autonomy and Paternalism.
J Clinic Res Bioeth (2011) 2:112. INDEX COPERNICUS: 4.1
 
Spassov, A, and Pavlovic, D.
The apple of Sir Isaac Newton
Letters to Editor. Am J Orthod Dentofacial Orthop 2011;139:714. (IF: 1.354)

Spassov A, Gredes T, Gedrange T, Pavlovic D, Lupp A, Kunert-Keil C.
Increased oxidative stress in dystrophin deficient (mdx) mice masticatory muscles
Exp Toxicol Pathol. 63: 549-552, 2011. IF: 2.283
 
Sharawy N, Pavlovic D, Wendt M, Cerny V, Lehmann C.
Evaluation of the effects of gender and estradiol treatment on the intestinal microcirculation during experimental sepsis.
Microvasc Res. 2011 Nov;82(3):397-403. IF: 3.100
 
Adler D, Gottfried SB, Bautin N, Mirkovic T, Schmidt M, Raux M, Pavlovic D, Similowski T, Demoule A.
Repetitive magnetic stimulation of the phrenic nerves for diaphragm conditioning: a normative study of feasibility and optimal settings.
Appl Physiol Nutr Metab. 2011 Oct 20. [Epub ahead of print]. IF: 2.215
 
Zhou J, Schmidt M, Johnston B, Wilfart F, Whynot S, Hung O, Murphy M, Cerny V, Pavlovic D, Lehmann C.
Experimental endotoxemia induces leukocyte adherence and plasma extravasation within the rat pial microcirculation.
Physiol Res. 2011 Oct 12. [Epub ahead of print]. IF: 1.646
 
Spassov A, Gredes T, Lehmann C, Gedrange T, Lucke S, Pavlovic D, Kunert-Keil C.
Myogenic differentiation factor 1 and myogenin expression not elevated in regenerated masticatory muscles of dystrophic (mdx) mice.
J Orofac Orthop. 2011 Nov 30. IF: 0.500

Spassov A, Gredes T, Gedrange T, Lucke S, Morgenstern S, Pavlovic D, Kunert-Keil C.
Differential expression of myosin heavy chain isoforms in the masticatory muscles of dystrophin-deficient mice.
Eur J Orthod. 2011 Dec;33(6):613-9. IF: 0.932


BOOKS
Dragan Pavlovic:
Research Notebook,
Greifswald, Germany, 2011, Copyright © Dragan Pavlovic 2011. ISBN: 2-911527-03-8 (170 p)
The Ohio State University Medical Center